Ideal Heat Solutions received an emergency call from a busy South London college. Their main boiler had overflowed early on a Monday morning following a critical failure in the plant room. This incident left thousands of students and staff without heating and hot water across the campus. With lectures, workshops, and essential on-site services scheduled to begin within hours, the college faced a severe operational challenge.
The situation required an immediate and dependable emergency temporary boiler hire solution that could restore services quickly, maintain safety, and support the campus while a permanent replacement system was arranged.
Ideal Heat Solutions mobilised straightaway, coordinating equipment, transport, personnel, and installation to get the college functional again the same day. The outcome was a successful deployment of two temporary boiler plants – 1120kW and 250kW – able to deliver consistent heating and hot water throughout the winter period and beyond.
Our approach combined technical expertise, structured planning, and clear communication. Below is a detailed breakdown of the full process from first call-out to long-term operation.
Upon arrival, the Ideal Heat Solutions engineering team assessed the situation alongside the London Fire Brigade, who had already removed the majority of the floodwater from the plant room.
Once safe entry was possible, the team performed a thorough investigation which revealed:
Understanding the full extent of the damage allowed the team to determine the size and type of temporary systems required. The college needed a dependable, high-output solution that could function independently of the damaged infrastructure.
Based on the site survey, Ideal Heat Solutions dispatched specialist equipment capable of supplying both heating and domestic hot water to a multi-building campus.
The deployed equipment included:
All equipment was delivered using a Hiab lorry, enabling the plant to be positioned accurately despite restricted access and limited manoeuvring space.
Within four hours of arriving on-site, the Ideal Heat Solutions engineering team had:
Crucially, the installation allowed the college to reopen essential facilities the same day. Heating and hot water were restored across classrooms, offices, corridors, communal areas, and welfare facilities.
This performance was particularly important given the time of year; January conditions had created a high demand for heating to maintain comfortable and safe indoor environments.
To fine-tune performance and enhance long-term reliability, the engineering team returned the following day to:
This follow-up visit ensured that the temporary boiler systems were not merely functioning — they were performing optimally and safely for as long as the college needed them.
The system ultimately remained in place for six months, operating without any failures while the college procured and installed a permanent plant room solution.
The temporary boiler plant was designed to support high-demand environments and ensure continuous operation:
The college required a temporary heating and hot water solution that could:
Ideal Heat Solutions delivered a tailored temporary system that met every requirement:
The solution was robust enough to keep the college fully functional for six months.
The college benefited from a comprehensive and dependable emergency heating and hot water solution.
Key outcomes included:
The college later commented that they would happily return to Ideal Heat Solutions should another need arise.
Ideal Heat Solutions is trusted across the UK education sector for temporary boiler hire during emergencies, refurbishments, and planned maintenance.
We provide:
Whether the requirement is emergency heating, temporary hot water, or full plant room replacement, we have the equipment and expertise to keep operations running smoothly.
A boiler failure in a large educational facility can quickly bring the entire campus to a standstill. In this case, Ideal Heat Solutions ensured that a South London college avoided prolonged closure by supplying and installing high-capacity temporary boiler systems within hours of the initial call.
The 1120kW and 250kW boiler plants provided consistent heating and hot water across the campus for six months, giving the college time to source and install a permanent replacement system. The installation was safe, efficient, and fully compliant, demonstrating Ideal Heat Solutions’ commitment to supporting critical environments with dependable temporary HVAC solutions.
How quickly can emergency temporary boilers be installed?
In many cases, installation can begin the same day, depending on access and initial safety checks.
Can temporary boilers support large educational campuses?
Yes — our fleet includes high-capacity systems suitable for multi-building facilities.
Do you offer temporary boilers for both heating and hot water?
Yes, our systems can provide both, with dedicated options for higher hot water demand.
How long can a temporary boiler remain on site?
Temporary boilers can remain in place for weeks, months, or longer if needed.
Do you provide contingency planning for colleges?
Yes — our Contingency Planning Service reduces downtime risk by prioritising emergency deployment.
Do you supply and manage fuel tanks?
Yes — full fuel management is available for all temporary boiler installations.
Need temporary, planned or emergency boiler hire for an educational site?
(For updates, behind-the-scenes content, engaging polls and more)